Construction in Los Angeles, CA
Built by Instinctor
What the law requires before you sign
Anyone performing construction work in California worth $1,000 or more in combined labor and materials must hold an active license from the Contractors State License Board. The threshold rose from $500 on 1 January 2025. Below $1,000 an unlicensed person may work only if the job needs no permit of any kind, nobody is hired to help, and the advertisement says they are not licensed. Anything requiring a permit needs a licensed contractor at any price. The license number must appear in advertising and on the contract, and you can verify it free on the CSLB website, where you will also see the license class, the bond, the workers' compensation filing and any disciplinary history. Check it yourself rather than accepting a photograph of a card.
California caps the down payment on a home improvement contract at $1,000 or 10 percent of the contract price, whichever is less, unless the contractor holds a specific qualifying bond. A contractor asking for 30 or 50 percent up front on a residential remodel is asking you to break the rule that protects you.
The contract must be in writing before work begins and must contain a payment schedule tied to work completed, start and completion dates, a description of the work, the license number, and notices on mechanics liens and the three-day right to cancel. That window is five business days if the buyer is 65 or over, and seven days on a contract to repair or restore a home damaged by fire or another sudden event. A one-page quote and a request for cash is not a contract. Confirm workers' compensation too: if an uninsured worker is injured on your property the exposure can land on you.
What it costs
Los Angeles is one of the most expensive construction markets in the country, and the figure that matters is cost per square foot for the specific work type, not a total.
Permitted work adds time and money that has nothing to do with the builder: plan check, structural review, Title 24 energy compliance, and separate electrical, plumbing and mechanical inspections. Hillside lots, soils reports, coastal zone review and historic overlay zones each add their own process, and ADU work has its own rules.
Get three itemized bids against the same written scope and compare line by line. A bid far below the other two is usually missing scope rather than finding efficiency. Hold a 10 to 20 percent contingency for anything that opens a wall in an older house here, because knob-and-tube wiring, galvanized supply lines, unpermitted previous work and seismic conditions are common and none of them appear in a bid.
What separates a good contractor from a bad one
They give a line-item bid against a written scope, not a lump sum. They tie payments to milestones. They pull permits in their own name, because a contractor asking you to pull an owner-builder permit is moving the liability to you. They name their subcontractors and carry the insurance. They say what they do not know yet and how it will be priced, which is what written allowances and a change-order process are for.
Before you sign
Verify the license number and class on the CSLB site. Ask for the certificate of insurance and the workers' compensation certificate. Ask who pulls the permits. Get the payment schedule in writing and refuse anything front-loaded. Ask how change orders are priced and require them in writing before the work happens. Ask for conditional and unconditional lien releases from subcontractors and suppliers as you pay, which is the only thing that stops a paid job producing a lien on your house. Ask for two recent job addresses and call those owners.
The common ways to lose money
A large cash deposit, then the crew appears one day a week or not at all.
Verbal change orders. The work happens, the bill arrives, and nothing is in writing.
An unpermitted addition, cheaper today and a disclosure, insurance and demolition problem later.
Allowances set artificially low for tile, fixtures and cabinetry, so the bid looks competitive and the real cost arrives in month three.
An unlicensed contractor on a large job: no bond, no CSLB arbitration, and no workers' compensation between you and an injury on your property.